First 15 minutes

Do not move the evidence before you record it.

Compare package count with the transport document, photograph the shipment on the vehicle and at the receiving point, capture every label and note visible exceptions before signing. If there is serious damage or an unsafe condition, stop and follow the written carrier, insurer and supplier process.

Delivery inspection sequence

  1. Prepare: have the purchase order, packing list, approved model and receiving contact ready.
  2. Count: reconcile pallets, crates, cartons and loose items before unloading is complete.
  3. Photograph: capture overview, every side, labels, seals, corners, straps and visible impact or moisture.
  4. Record exceptions: write observable facts, not guesses about cause.
  5. Segregate: keep suspect packages protected and separate.
  6. Unpack methodically: preserve labels and internal protection while checking parts.
  7. Report: send one evidence set linked to package and part numbers.

What to check by shipment layer

LayerChecksEvidence
Transport unitPackage count, orientation, movement, water or impact signsWide photos before unloading
Crate or cartonLabel, seal, puncture, crush, corner and strap conditionAll sides plus label close-up
Internal protectionFoam, blocking, wrap, moisture barrier and movementPhotos before components are removed
Major componentsBed/slate, cabinet, rails, legs, frame and topsPart ID and affected surface
Hardware and accessoriesFasteners, feet, pockets, balls, cues, cloth and manualsCount against packing list

Damage notes should be factual

Write “right-front crate corner crushed approximately 60 mm; rail carton beneath shows torn wrap” rather than “factory packed it badly.” Record time, location, package ID and who was present. Do not discard packaging until the evidence and disposition are agreed.

Parts quarantine and release

Mark suspect parts so an installer cannot accidentally use them. Separate cosmetic issues from structural, playing or safety issues, but do not decide acceptance rules during unloading. Use the purchase specification, contract, insurance and written claim process.

Send a complete evidence packet

  • Purchase order and shipment reference
  • Delivery date, location and receiving contact
  • Package count received versus expected
  • Transport and package photos in sequence
  • Package and part identifiers
  • Measured damage and affected quantity
  • Requested next action, without destroying evidence

Continue to installation handover

Operational boundary

Contract and carrier procedures control claims.

This checklist is an original receiving workflow for evidence preservation. It does not replace the bill of lading, Incoterm, insurance policy, carrier procedure, purchase contract, local law or safety instructions. Confirm deadlines and required notice with the responsible parties.

Reviewed November 11, 2026. Commercial responsibility, claim eligibility and remedy are order-specific.