Handover rule

Accept the specification, not just the appearance.

Match the installed model, position and components to the approved order. Test playing and operating functions, then document open items with photographs, owner, remedy and due date. Do not rely on a verbal promise to remember defects later.

Installation handover sequence

  1. Confirm room, table ID, model, finish and included components.
  2. Inspect floor protection, position, clearances and lighting relationship.
  3. Verify frame, legs, fasteners, supports and leveling points.
  4. Check bed or slate seams, cloth tension and visible surface.
  5. Inspect rails, cushion response, pocket or return operation.
  6. Count accessories, keys, spares, manuals and tools.
  7. Run the agreed play and operation tests.
  8. Create and sign the punch list before the team leaves.

Handover inspection table

AreaVerifyRecord
IdentityModel, serial or project ID, finish and cloth colorOverview and label photos
StructureFrame, legs, support, fasteners and stabilityInstaller confirmation and exceptions
Playing surfaceLevel, seams, cloth tension, debris and visible damageTool readings and test notes
Rails and pocketsAlignment, cushion response, pocket fit or ball returnTest balls and affected position
OperationCoin, electronic, LED or dining functions if orderedFunction result and settings
CloseoutAccessories, spares, cleaning, waste and documentsSigned inventory and punch list

A practical play test

Roll clean, matched balls slowly along multiple lines to reveal drift, then test representative cushion and pocket positions. A casual roll is not a certified measurement, so use the contract or model-specific method for formal acceptance. Record the tool, location, result and any adjustment made.

Build a punch list that closes

Give each item a unique number, exact table location, photograph, severity, responsible party, proposed remedy and due date. Separate “open” from “verified closed.” A cosmetic mark and a playing-surface issue should not share the same priority.

Documents and maintenance handover

  • Approved specification and order revision
  • Installation and leveling record
  • Parts and accessory inventory
  • Cleaning and cloth-care instructions
  • Warranty and service contact process
  • Spare-parts identification and reorder route
  • Electrical instructions for lights, coin or LED systems

Build the maintenance schedule

Acceptance boundary

The written order defines pass or fail.

This checklist is an original operational aid. Final tolerances, test tools, acceptance rights, installer responsibility and remedy must come from the approved specification, installation scope and contract.

Reviewed November 11, 2026. Keep the signed handover and punch-list closure with the table record.