Accept the specification, not just the appearance.
Match the installed model, position and components to the approved order. Test playing and operating functions, then document open items with photographs, owner, remedy and due date. Do not rely on a verbal promise to remember defects later.
Installation handover sequence
- Confirm room, table ID, model, finish and included components.
- Inspect floor protection, position, clearances and lighting relationship.
- Verify frame, legs, fasteners, supports and leveling points.
- Check bed or slate seams, cloth tension and visible surface.
- Inspect rails, cushion response, pocket or return operation.
- Count accessories, keys, spares, manuals and tools.
- Run the agreed play and operation tests.
- Create and sign the punch list before the team leaves.
Handover inspection table
| Area | Verify | Record |
|---|---|---|
| Identity | Model, serial or project ID, finish and cloth color | Overview and label photos |
| Structure | Frame, legs, support, fasteners and stability | Installer confirmation and exceptions |
| Playing surface | Level, seams, cloth tension, debris and visible damage | Tool readings and test notes |
| Rails and pockets | Alignment, cushion response, pocket fit or ball return | Test balls and affected position |
| Operation | Coin, electronic, LED or dining functions if ordered | Function result and settings |
| Closeout | Accessories, spares, cleaning, waste and documents | Signed inventory and punch list |
A practical play test
Roll clean, matched balls slowly along multiple lines to reveal drift, then test representative cushion and pocket positions. A casual roll is not a certified measurement, so use the contract or model-specific method for formal acceptance. Record the tool, location, result and any adjustment made.
Build a punch list that closes
Give each item a unique number, exact table location, photograph, severity, responsible party, proposed remedy and due date. Separate “open” from “verified closed.” A cosmetic mark and a playing-surface issue should not share the same priority.
Documents and maintenance handover
- Approved specification and order revision
- Installation and leveling record
- Parts and accessory inventory
- Cleaning and cloth-care instructions
- Warranty and service contact process
- Spare-parts identification and reorder route
- Electrical instructions for lights, coin or LED systems
The written order defines pass or fail.
This checklist is an original operational aid. Final tolerances, test tools, acceptance rights, installer responsibility and remedy must come from the approved specification, installation scope and contract.
Reviewed November 11, 2026. Keep the signed handover and punch-list closure with the table record.